WATCH: Time-lapse video of part of Bertha being hauled to the surface

SEATTLE -- On Thursday, there was a 270-ton lift of Bertha’s upper front body segment to the surface to being repairs on the tunnel boring machine.

This is a time-lapse taken from the view of the cab operator of the crane that lifted the segment. It was published by the Washington State Department of Transportation.